You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Graffiti on bridge support

Reported via mobile in the Graffiti (NH) category anonymously at 22:42, Saturday 8 August 2026

Sent to National Highways less than a minute later. FixMyStreet ref: 9919026.

This has been reported on several occasions and it's been over a year- a lot longer.

From junction 6 to junction 4- the bridge support in between these junctions has offensive graffiti which needs to ve removed ASAP.

Why is this not being priorised at all.

In addition- junction 6- the signs have graffiti which again is not being priorised

Updates

  • Thank you for contacting National Highways about graffiti.

    We aim to remove or cover offensive graffiti within 24 hours of our inspection.

    Non-offensive graffiti is dealt with under planned cyclical works and therefore can take longer to remove.

    We will arrange for our local inspector to look at this on his regular safety inspection of this route and they will arrange a suitable solution.

    Kind regards

    National Highways

    State changed to: Internal referral

    Posted by National Highways at 21:08, Tuesday 11 August 2026

This report is now closed to updates from the public. You can make a new report in the same location.