You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

OSB boards placed on top of bridge mesh

Reported via mobile in the Structures (eg bridges, fencing, noise barriers) (NH) category anonymously at 12:29, Friday 24 July 2026

Sent to National Highways less than a minute later. FixMyStreet ref: 9840571.

There are 2 OSB boards placed on the top of the bridge mesh, directly above the slip road. This poses danger to road users, and in a strong wind could be blown down.

Updates

  • Thank you for your report.

    Our inspection team visited the location on 29 July 2026 to assess the issue. Remedial work has been raised with our maintenance partners to remove the discarded OSB boards as soon as it's possible.

    Thank you again for taking the time to contact us.

    Kind regards,

    National Highways

    State changed to: Closed

    Posted by National Highways at 15:55, Wednesday 29 July 2026

This report is now closed to updates from the public. You can make a new report in the same location.