You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Tarmac sections starting to raise

Reported via mobile in the Road surface (NH) category anonymously at 08:45, Wednesday 3 June 2026

Sent to National Highways less than a minute later. FixMyStreet ref: 9552036.

The tarmac section by the J4 eastbound on-ramp sliproad is starting to raise. The start and end of the tarmac section is beginning to lift into speed humps.

It would be worth fixing this (and the same is happening on the next two short tarmac sections between J4 and J4) before it becomes a dangerous issue.

The next one down the road (over the bridge section) was potentially motorcycle lethal before being fixed. Please don't let them get to that level again.

Updates

  • Thank you for making your report. We have asked our inspection team to attend this location and assess the issue.

    If any work is needed, they will arrange for this to happen. Should no immediate work be required we will continue to monitor this during our regular inspections.

    Although we always aim to complete repairs as quickly as possible, timescales do vary as we try to minimise disruption to customers by combining activities into single closures and always ensuring the safety of our people.

    Kind regards National Highways

    State changed to: Internal referral

    Posted by National Highways at 21:39, Thursday 4 June 2026

This report is now closed to updates from the public. You can make a new report in the same location.