Previous pothole repair is already failing

Reported via desktop in the Pothole (NH) category by Chris Woods at 13:31, Tuesday 28 April 2026

Sent to National Highways less than a minute later. FixMyStreet ref: 9367227.

Large road surface breakdown, reported previously (FixMyStreet ref: 8831763). It looks like the broken-up carriageway was hurriedly patched with some coldmix however the actual holes/broken carriageway are still very uneven and the filler does not meet the same level as the road surface, resulting in further wear to vehicles. Potential for further potholes to open up seems quite high.

I think the whole damaged section of carriageway needs cutting away and properly resurfacing, as has been done in several other parts of the M60 stretch between J12 and Barton Viaduct. The damage being reported is in the wheel tracks of vehicles, including many HGVs which take this exit slip, so is wearing again quite quickly.

Updates

  • Thank you for making your report. We have asked our inspection team to attend this location and assess the issue.

    If any work is needed, they will arrange for this to happen. Should no immediate work be required we will continue to monitor this during our regular inspections.

    Although we always aim to complete repairs as quickly as possible, timescales do vary as we try to minimise disruption to customers by combining activities into single closures and always ensuring the safety of our people.

    Kind regards National Highways

    State changed to: Internal referral

    Posted by National Highways at 11:25, Wednesday 6 May 2026

This report is now closed to updates from the public. You can make a new report in the same location.