Barbed wire fencing down, debris accumulations, heavily silted walkway under the M1 underpass by the river.

Reported via desktop in the Structures (eg bridges, fencing, noise barriers) (NH) category anonymously at 14:44, Wednesday 18 March 2026

Sent to National Highways less than a minute later. FixMyStreet ref: 9136183.

At this location the M1 crosses the River Rother and there are walkways beneath the road bridge on either bank to allow landowner access. The right bank (east bank) is a public footpath and that is clear but the left bank (west bank) is heavily silted from the river making landowner access very difficult and a hazard. There are also build ups of debris, vegetation and old barbed wire fences at the boundary of the highways land with the overpass and the private land to the south of the bridge that need clearing as it is somewhat hazardous.

Updates

  • Thank you for making your report. We have asked our inspection team to attend this location and assess the issue.

    If any work is needed, they will arrange for this to happen. Should no immediate work be required we will continue to monitor this during our regular inspections.

    Although we always aim to complete repairs as quickly as possible, timescales do vary as we try to minimise disruption to customers by combining activities into single closures and always ensuring the safety of our people.

    Kind regards National Highways

    State changed to: Closed

    Posted by National Highways at 09:33, Thursday 26 March 2026

This report is now closed to updates from the public. You can make a new report in the same location.