Back to all reports

Road surface

Reported via desktop in the Road surface (NH) category by Andrew Newmarch at 13:40, Wednesday 11 March 2026

Sent to National Highways less than a minute later. FixMyStreet ref: 9087687.

The road was surfaced in sections, and where the two sections join, it is all coming up, resulting in long, thin potholes. I can see that there has been a partial repair before, but the reality is that this entire circle needs the wearing course to be milled out and a new 60 mm layer laid, with great attention paid to the bonding along the edge. The drains in this area also need to be checked and cleaned out.

Updates

  • Thank you for making your report. We have asked our inspection team to attend this location and assess the issue.

    If any work is needed, they will arrange for this to happen. Should no immediate work be required we will continue to monitor this during our regular inspections.

    Although we always aim to complete repairs as quickly as possible, timescales do vary as we try to minimise disruption to customers by combining activities into single closures and always ensuring the safety of our people.

    Kind regards National Highways

    State changed to: Internal referral

    Posted by National Highways at 10:45, Friday 13 March 2026