You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Debris/Mud/Vegetation on pavement

Reported via desktop in the Pavement/footpath/cycleway/bridleway issue (NH) category by Christopher Scott at 14:12, Tuesday 24 February 2026

Sent to National Highways less than a minute later. FixMyStreet ref: 8989582.

Build-up of broken road surface deposited on pavement. Build-up of vegetation on pavement. Build-up of mud on pavement. All contributing to poor drainage and slippery/treacherous underfoot. Pedestrians have to wade through mud etc.

Updates

  • Thank you for your report. Our inspection team have confirmed that both the eastbound and westbound carriageways on the approaches to, and exits from, Lancing Manor Roundabout are on our needs list for replacement of the High Friction Surfacing (HFS). The cycleway and footway have been swept, and the gullies, combined kerbs, and drainage systems are scheduled to be gully‑sucked and jetted as part of upcoming remedial works by our maintenance partners. Thank you again for taking the time to contact us. Kind regards, National Highways

    State changed to: Closed

    Posted by National Highways at 10:10, Tuesday 3 March 2026

This report is now closed to updates from the public. You can make a new report in the same location.