You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Overhead bridge across the princess parkway looks unstable

Reported via mobile in the Structures (eg bridges, fencing, noise barriers) (NH) category anonymously at 08:51, Wednesday 28 January 2026

Sent to National Highways less than a minute later. FixMyStreet ref: 8784117.

This bridge looks to have a gap between the joins that looks unstable to the untrained eye. The bridge design has a click clack design so some gaps would be normal I imagine but it does looks too wide a gap and does have water marks around it suggesting further it is not functioning as it should compared to the other join at the other side of the bridge.

Updates

  • Thank you for making your report. We have asked our inspection team to attend this location and assess the issue.

    If any work is needed, they will arrange for this to happen. Should no immediate work be required we will continue to monitor this during our regular inspections.

    Although we always aim to complete repairs as quickly as possible, timescales do vary as we try to minimise disruption to customers by combining activities into single closures and always ensuring the safety of our people.

    Kind regards National Highways

    State changed to: Internal referral

    Posted by National Highways at 07:48, Friday 6 February 2026

This report is now closed to updates from the public. You can make a new report in the same location.