You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Exessive roadside litter between Junction 2 and 3 London bound.

Reported via desktop in the Main Carriageway (NH) category anonymously at 07:51, Saturday 24 January 2026

Sent to National Highways less than a minute later. FixMyStreet ref: 8755895.

Exessive roadside litter from Merrals Shaw Interchange roundabout leading down to roundabouts and slip roads that join M2 london bound, but also as you return from the M2 Faversham bound and join the 2 roundabouts at junciton 2 to go to A228.

Updates

  • Thank you for contacting National Highways about litter on the M2.

    We have passed your report to our local inspector who will review the issue as part of their litter surveys across our roads in the southeast during January.

    Littering by people is, unfortunately, a behaviour that has a big impact on some parts of our roads. We aim to keep our roads as tidy and free of litter as we can. Our litter picking is carefully planned to try to minimise the impact it has on road users and the safety of our people.

    Litter picks often require lane or full slip road closures, which are disruptive to traffic flow. To help reduce the frequency of this disruption, where we can, we usually combine our reactive litter picks with other maintenance work which can result in what appears to be a delayed response.

    Kind regards

    National Highways

    State changed to: Closed

    Posted by National Highways at 16:57, Monday 26 January 2026

This report is now closed to updates from the public. You can make a new report in the same location.