You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

2 chevrons missing on M181 roundabout since 16th September

Reported via mobile in the Damage to Sign (NH) category anonymously at 06:59, Wed 5 November 2025

Sent to National Highways less than a minute later. FixMyStreet ref: 8377698.

2 chevrons have still not been replaced on the M181 roundabout at this location when a lorry ran through the roundabout heading northbound. Given the seriousness of this accident with a lorry ploughing through the roundabout after not noticing the signage and causing delays to traffic on the road. Why has it taken 7 weeks to even replace 2 key safety signs that were there to help drivers see the upcoming roundabout. Do you have a policy to correct such signs after accidents in a timely manner? These signs being missing are increasing the chances of a driver not noticing the roundabout again and having a similar accident occuring. Can this be given some attention soon please. Please advise date this will be fixed by. Thanks in advance

Updates

  • Thank you for reporting this issue to us via FixMyStreet.

    Our maintenance team are aware of your report and have a repair planned for the location within the next 28 days.

    Kind Regards, National Highways

    State changed to: Closed

    Posted by National Highways at 15:37, Thu 6 November 2025

This report is now closed to updates from the public. You can make a new report in the same location.