Multiple Surface Defects

Reported via desktop in the Pavement/footpath/cycleway/bridleway issue (NH) category anonymously at 16:53, Mon 18 August 2025

Sent to National Highways less than a minute later. FixMyStreet ref: 8042083.

Multiple road surface defects getting worse. Several sections of surface breaking up. The repairs to the foot bridge ramps over the M11 near Coton CB23 were completed on 18 Jul 2025. They were not performed to the relevant British Standard specifications. The surface was not properly prepared before laying the tarmac. As a result as of 18 Aug 2025 the previous cracks are reappearing already and they are dangerous to cyclists. Please arrange the repairs. Thanks

Updates

  • Thank you for making your report. We have asked our inspection team to attend this location and assess the issue.

    If any work is needed, they will arrange for this to happen. Should no immediate work be required we will continue to monitor this during our regular inspections.

    Although we always aim to complete repairs as quickly as possible, timescales do vary as we try to minimise disruption to customers by combining activities into single closures and always ensuring the safety of our people.

    Kind regards National Highways

    State changed to: Internal referral

    Posted by National Highways at 11:27, Wed 20 August 2025