You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Graffiti on two bridge supports on North bound side between JCT 10 and 9

Reported via desktop in the Graffiti (NH) category anonymously at 08:22, Tue 12 August 2025

Sent to National Highways less than a minute later. FixMyStreet ref: 8012491.

There is a lot of graffiti on the bridge supports between the two bridges by Whateley lane farm. It is on the North bound side. Spotted this morning. So must have happened on the night of 11/08/2025 as it wasn't there on the morning of the same day.

Updates

  • Thank you for contacting National Highways about graffiti.

    We aim to remove or cover offensive graffiti within 24 hours of our inspection.

    Non-offensive graffiti is dealt with under planned cyclical works and therefore can take longer to remove.

    We will arrange for our local inspector to look at this on his regular safety inspection of this route and they will arrange a suitable solution.

    Kind regards

    National Highways

    State changed to: Internal referral

    Posted by National Highways at 07:55, Wed 13 August 2025

This report is now closed to updates from the public. You can make a new report in the same location.