You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Very uneven carriageway surface due to settlement of surface as you approach the bridge structure. 75 m step in surface very dangerous if you hit this at anything above 5mph, Warning signs need to be erected urgently prior to a temporary repair being completed. This issue has been reported on numerous occasions on your Reporting Page and no action has been taken, maybe it needs someone to have a Major Accident before you will action this dangerous situation.

Reported via mobile in the Road surface (NH) category anonymously at 15:47, Friday 4 July 2025

Sent to National Highways less than a minute later. FixMyStreet ref: 7810110.

Carriageway surface has settled on either side of the bridge structure causing a very dangerous step in the surfacing approx 75mm high, causing a potentially dangerous defect if any vehicle hits this above 5mph. Urgent attention required.

Updates

  • Thank you for contacting National Highways.

    We are pleased to confirm that the issue you reported has now been resolved. We hope that this improves any future experience you have using this road.

    Kind regards

    National Highways

    State changed to: Fixed

    Posted by National Highways at 11:14, Monday

This report is now closed to updates from the public. You can make a new report in the same location.