Various poorly previous filled in potholes breaking up
Reported via desktop in the Pothole (NH) category anonymously at 12:38, Thu 27 March 2025
Sent to National Highways less than a minute later. FixMyStreet ref: 7346915.
You have resurfaced lanes 1-3 from junction 19 (clockwise) for about 500 yards that were not as bad as the entirety of lane 2 from where you have finished until junction 21. I have torn my near side front tyre which now needs replacing. God forbid some poor sole on a motorbike hitting one of these changing lane as you'll have a bigger problem liability wise. The opposite carriageway anti clockwise is just as bad with a recent resurface in lane one but you have forgotten there are 3 lanes with poor previous repairs crumbling and a danger to everyone. This has been bad for coming up for 12mths if not longer as I use this motorway in both directions 6 days a week and the sensible decision would be to resurface the entire carriageway on both sides from Junction 21 to 19 as it's been terrible for years and probably on the original surface from 2000 when the section was opened
Updates
-
Thank you for making your report. We have asked our inspection team to attend this location and assess the issue.
If any work is needed, they will arrange for this to happen. Should no immediate work be required we will continue to monitor this during our regular inspections.
Although we always aim to complete repairs as quickly as possible, timescales do vary as we try to minimise disruption to customers by combining activities into single closures and always ensuring the safety of our people.
Kind regards National Highways
State changed to: Internal referral
Posted by National Highways at 06:51, Tue 1 April 2025
This report is now closed to updates from the public. You can make a new report in the same location.