Concrete joints expanded to large, regular gaps - A180(W) Lane 1: between A1173 JN and B1210 overbridge

Reported via mobile in the Road surface (NH) category anonymously at 10:58, Fri 7 March 2025

Sent to National Highways less than a minute later. FixMyStreet ref: 7240301.

A180(W) Lane 1 from the A1173 junction at every 2/3 metre intervals there are deep perpendicular trenches where wheels are constantly dropping in and out of. This continues all the way until the B1210 overbridge where in lane 1, there is now a very harsh and raised transition to the asphalt road surface.

Updates

  • Thank you for making your report. Our inspection team have attended this location to assess the issue.

    The road surface at this location is very much consistent with all the other concrete sections on the westbound A180.

    However, we will continue to monitor this during our regular inspections.

    We thank you for contacting us about this matter.

    Kind regards National Highways

    State changed to: Internal referral

    Posted by National Highways at 14:18, Mon 17 March 2025

This report is now closed to updates from the public. You can make a new report in the same location.