You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Ditches filled/blocked

Reported via mobile in the Flooding/drainage (NH) category anonymously at 12:41, Thu 14 November 2024

Sent to National Highways less than a minute later. FixMyStreet ref: 6731528.

The ditches along side the M5 and Hortham brook are blocked and filled with soil and lorry tyres that maybe contributing to the regular flooding of the M5 recently

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for making your report about the blocked ditch.

    We have asked our inspection team to attend this location and assess the issues you've raised.

    If any work is needed, they will arrange for this to happen. Should no immediate work be required we will continue to monitor this during our regular inspections.

    Kind regards

    National Highways

    Posted by Haydn Olney at 13:00, Fri 15 November 2024

Provide an update

Please note that updates are not sent to National Highways. Your information will only be used in line with our privacy policy

Next: Tell us about you

Your update

Tell us about you

Do you have a National Highways Report a problem password?