You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

At least 3 missing tiles on bridge

Reported via desktop in the Structures (eg bridges, fencing, noise barriers) (NH) category anonymously at 14:52, Wed 6 November 2024

Sent to National Highways less than a minute later. FixMyStreet ref: 6701837.

Rubber mat tiles missing

Updates

  • Thank you for your report.

    Our team visited the site on 7 November to assess the footbridge and confirmed there are 2 floor tiles missing.

    Remedial work has been arranged to have the gaps left behind filled in within the next 24 hours to reduce any potential trip hazards.

    Kind Regards

    National Highways

    State changed to: Closed

    Posted by National Highways at 11:27, Thu 7 November 2024

This report is now closed to updates from the public. You can make a new report in the same location.