Roadwork contractors installed 2 way traffic lights on a 3-way junciton

Reported via mobile in the Traffic lights (NH) category by James Crawley at 08:04, Sun 29 September 2024

Sent to National Highways less than a minute later. FixMyStreet ref: 6528323.

The junction of Brooklands Rd & A259 is normally a three way traffic signal controlled junction. Roadwork contractors have installed two way traffic lights, with just a pedestrian crossing on the Brooklands rd side. This means that traffic cannot safely exit Brooklands rd. This is causing major delays and has already led to one RTC. There is no work being doing on the roadworks over the weekend period, these lights could easily be removed.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for making your report,

    The works referred to in your enquiry are 3rd party works which are being undertaken by The Electricity Network Company Limited. If you wish to take your enquiry further please contact them on the below link.

    Https://www.gtc-uk.co.uk/contact-us/

    I can however confirm that the timing of the traffic lights at this location has been reported to be fixed.

    Kind Regards,

    National Highways.

    State changed to: Closed

    Posted by National Highways at 17:02, Fri 4 October 2024

This report is now closed to updates from the public. You can make a new report in the same location.