You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Widening Sliproad From Sliverlink Because it doesnt give us time to join on its FORCES US ON!

Reported via mobile in the Abandoned Materials (NH) category anonymously at 18:40, Wed 22 May 2024

Sent to National Highways less than a minute later. FixMyStreet ref: 6008506.

Widening Sliproad From Sliverlink Because it doesnt give us time to join on its FORCES US ON, so we are going to Improve it, which is Extrending it pass the bridge we going to make the bridge bigger like structuring The bridges like the A1 Birtley to Coal House on Eighton Lodge Roundabout bridges we do that for this bridge and do mager works on Middle Engine Ln so we can widening the sliproad because sliproad are ment to be 500 meters long for Joining and i dont think this is 500 meters look how short it is from the Chevron Hatching its so short thats why we need to make it longer. i hope you can start this Scheme Soon!

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • .

    State changed to: Closed

    Posted by National Highways at 14:54, Tue 28 May 2024

This report is now closed to updates from the public. You can make a new report in the same location.