Failed backfill behind bridge abutment

Reported via desktop in the Structures (eg bridges, fencing, noise barriers) (NH) category anonymously at 10:20, Mon 13 May 2024

Sent to National Highways less than a minute later. FixMyStreet ref: 5965421.

The backfill behind the new bridge abutments spanning the new A556 has sunk. This could be a failure of the back of wall drainage or backfill materials installed adjacent to the abutment (or lack of back of wall drainage). Long term settlement will occur as the bump now being experienced when travelling over the bridge is getting worse. The settlement has been evident for several months.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for making your report. We have asked our inspection team to attend this location and assess the issue.

    If any work is needed, they will arrange for this to happen. Should no immediate work be required we will continue to monitor this during our regular inspections.

    Although we always aim to complete repairs as quickly as possible, timescales do vary as we try to minimise disruption to customers by combining activities into single closures and always ensuring the safety of our people.

    Kind regards National Highways

    State changed to: Internal referral

    Posted by National Highways at 17:02, Wed 15 May 2024

This report is now closed to updates from the public. You can make a new report in the same location.