You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Large chunks road misding

Reported via mobile in the Road surface (NH) category anonymously at 07:57, Tuesday 19 March 2024

Sent to National Highways less than a minute later. FixMyStreet ref: 5734639.

Both sides of motorway lane 1-2 between j 19 to 21 clockwise and also anticlockwise same stretch seriously dangerous full of potholes deteriorated carriageway holes large and wide! had to swerve to avoid one, almost hitting a car! Near the sliproad coming onto the motorway just before j19 M60 anticlockwise, this will cause a major accident soon.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for making your report about potholes and the road surface on both sides of motorway lane 1 and 2 between J19 to 21 clockwise and anticlockwise. You also reported the slip road coming onto the motorway just before J19 M60 anticlockwise. We have asked our inspection team to attend this location and assess the issue.

    If any work is needed, they will arrange for this to happen. Should no immediate work be required we will continue to monitor this during our regular inspections.

    Although we always aim to complete repairs as quickly as possible, timescales do vary as we try to minimise disruption to customers by combining activities into single closures and always ensuring the safety of our people.

    Kind regards National Highways

    State changed to: Internal referral

    Posted by National Highways at 14:30, Tuesday 26 March 2024

This report is now closed to updates from the public. You can make a new report in the same location.