You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Several blocked storm drains and historical issues with leaks into sewerage, flooding on the a1 east bound and subsequent flooding of sewerage and brook. Major connection issues with sewerage pipe being cut when the motorway was duelled.

Reported via mobile in the Flooding/drainage (NH) category anonymously at 16:41, Thursday 7 March 2024

Sent to National Highways less than a minute later. FixMyStreet ref: 5682726.

Major flooding into storm drains on the a1 causing unmanageable flooding into the sewage network. Drains are completely blocked and full of debris, restriction and blockages in the pipeline under the a1 for the begwary brook is restricting flow and causing flooding issues up stream and down stream of the brook.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for making your report. We have asked our inspection team to attend this location and assess the issue.

    If any work is needed, they will arrange for this to happen.

    Although we always aim to complete repairs as quickly as possible, timescales do vary as we try to minimise disruption to customers by combining activities into single closures and always ensuring the safety of our people.

    Kind regards National Highways

    State changed to: Internal referral

    Posted by National Highways at 14:11, Sunday 10 March 2024

This report is now closed to updates from the public. You can make a new report in the same location.