You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Absolute disgrace.

Reported via mobile in the Traffic lights (NH) category anonymously at 18:45, Thu 22 February 2024

Sent to National Highways less than a minute later. FixMyStreet ref: 5617318.

I feel that residents of Over Wyre have been forgotten about during the whole process of building the new bypass (which in my opinion was an unecessary waste of money). It used to take me 15-20 minutes to get to Hodgson high school in Poulton. It is now taking well over 1 hour. I work in fleetwood as a teacher, I have to set of before 7am to ensure I get to work on time. However, on the way home to Over Wyre (which would traditionally be ‘rush hour’) it takes me at most 20 minutes. I have had to stop taking my children to their extra curricular activities because I cannot get them there on time with the current state of the tracfic. There are times when the traffic is queued back well into Hambleton. In fact recently traffics was almost queued into stalmine. This is why I am asking, have National Highways given any consideration whatsoever to people who use shard bridge on a daily basis. It seems not. This issue has been ongoing for some time now and nothing seems to be getting better.

Provide an update

Please note that updates are not sent to National Highways. Your information will only be used in line with our privacy policy

Next: Tell us about you

Your update

Tell us about you

Do you have a National Highways Report a problem password?