You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Collection of potholes from around 2/3rds way down entry slipway continuing to end of entry slipway

Reported via desktop in the Pothole (NH) category anonymously at 14:36, Wed 14 February 2024

Sent to National Highways less than a minute later. FixMyStreet ref: 5576684.

Potholes have formed across entire width of slipway starting from around 2/3rds and continuing to the end of the slipway.

Hitting one or many of the deep holes is now unavoidable when merging onto the A12 from the slipway and is especially dangerous in dark conditions, taking attention away from merging onto the carriageway in attempts to avoid damage to vehicles.

Potholes have been present for a number of months now and have been getting steadily worse with the recent cold and wet weather.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for making your report. We have asked our inspection team to attend this location and assess the issue.

    If any work is needed, they will arrange for this to happen.

    Although we always aim to complete repairs as quickly as possible, timescales do vary as we try to minimise disruption to customers by combining activities into single closures and always ensuring the safety of our people.

    Kind regards National Highways

    State changed to: Internal referral

    Posted by National Highways at 14:46, Thu 15 February 2024

This report is now closed to updates from the public. You can make a new report in the same location.