You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Whole stretch of verge Colchester bound between Goose Green Wix Junction on A120 to Horsley Cross Roundabout

Reported via mobile in the Abandoned Materials (NH) category anonymously at 15:24, Mon 4 December 2023

Sent to National Highways less than a minute later. FixMyStreet ref: 5281083.

Road works were undertaken on the verge of the A120 by a contractor fitting pipes under the ground for over a month from Wix Junction to Goose Green to Horsely Cross Roundabout. There is debris left along the stretch and more importantly when the undertook the work and finished they did not landscape the ground level as it was before and have left it like a building site with thick deep tracks all over the whole half mile stretch looks terrible. Surely that should be left landscaped and seeded as it was cut grass there before hand. Mud is all over the kurbs and onto the road. No one has done an inspection of the finished works clearly and its just been left.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for contacting National Highways regarding the roadworks on the A120.

    We will arrange for one of our local inspectors to investigate this.

    Kind regards National Highways

    State changed to: Internal referral

    Posted by National Highways at 08:02, Tue 5 December 2023

This report is now closed to updates from the public. You can make a new report in the same location.