Status unknown
Badly broken up road surface. Extends for a 50 metre length as the slip road is starting to merge with the A63 carriageway.
Reported via desktop in the Road surface (NH) category by Dr. Peter Oxberry at 02:51, Thu 23 November 2023
Sent to National Highways less than a minute later. FixMyStreet ref: 5243783.
Road surface is breaking up. Already formed several interlinking ruts, approx 50 metres in length. Often unable to avoid, as having to merge with 70mph traffic obviates precise choice of entry to main carriageway. Hitting this damaged surface at anything over 30mph is dangerous! This problem gradually been worsening over past 9 months. Freezing weather will make it inherently more dangerous. This whole junction is deteriorating rapidly now. The surface conditions at the 2 roundabouts, especially the northern one, are quite bad with potholes now present and growing in size.
Updates
-
Thank you for reporting this issue to us via FixMyStreet.
We appreciate the time you’ve taken to contact us about this.
We're aware of the issues you've reported. We've a future resurfacing scheme planned for this location. In the meantime, we've instructed temporary repairs and uneven road signage be implemented.
Kind Regards, National Highways
State changed to: Action scheduled
Posted by National Highways at 15:14, Tue 28 November 2023
-
Signs have be put up, but no repairs (not even temporary tarmac) so far. When are you actually going to do something useful???
Posted anonymously at 22:10, Sun 3 December 2023
-
Slip road to main carriageway continues to degrade - still a 50 yard stretch of potholes - invisible in the dark/wet and a life threatening danger to motorcyclists
Posted by richard swatman at 12:01, Wed 7 February 2024
-
The post of 28/11/23 is favtually incorrect. No temporary repairs have been made. The surface continues to get worse...the hole must be 10 meters long now! And the uneven road signs mean you acknowledge there is a problem. But wehn are you actually going to resurfave the sliproad? We are looking for some ACTION to resolve the holes!
Posted anonymously at 08:30, Thu 8 February 2024
Provide an update
Please note that updates are not sent to National Highways. Your information will only be used in line with our privacy policy