You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

M27 Jct 5 - Jct 7

Reported via mobile in the Road surface (NH) category anonymously at 19:40, Sun 5 November 2023

Sent to National Highways less than a minute later. FixMyStreet ref: 5177292.

The road lines / markings on this stretch of motorway when wet / in direct sunlight are impossible to see. The road surface on this stretch of the motorway floods and is extremely dangerous when wet.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • I’d like to thank you for bringing this issue to our attention and I apologise confusion these road markings are causing. We really appreciate the information and feedback we receive, and value the perspective you bring as someone who uses our network. I’m pleased to report that we do have plans to address this issue in the coming year. An overlay scheme will be replacing the existing concrete with tarmac to address the driving experience and the difficulty with visibility due to the glare from the sun. For further information I’ve included a link to our webpage where all of our updates can be found https://nationalhighways.co.uk/ our-roads/ south-east/ m27-junction-5-to-7-concrete-overlay/

    State changed to: Internal referral

    Posted by National Highways at 12:00, Tue 7 November 2023

This report is now closed to updates from the public. You can make a new report in the same location.