You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Graffiti

Reported via desktop in the Graffiti (NH) category anonymously at 10:26, Tue 19 September 2023

Sent to National Highways less than a minute later. FixMyStreet ref: 5008931.

Graffiti everywhere on the sides of the motorway and under the railway bridge

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for contacting National Highways about graffiti.

    We aim to remove or cover offensive graffiti within 24 hours of our inspection. Non-offensive graffiti is dealt with under planned cyclical works and can take much longer.

    We'll arrange for our local inspector to look at this on his regular safety inspection of this route and they'll arrange a suitable solution.

    Kind regards

    National Highways

    State changed to: Internal referral

    Posted by National Highways at 07:58, Fri 22 September 2023

This report is now closed to updates from the public. You can make a new report in the same location.