You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Footpath / Cycleway on Roundabout & Bridleway blocked by Armco barriers

Reported via desktop in the Pavement/footpath issue (NH) category anonymously at 10:23, Sat 16 September 2023

Sent to National Highways less than a minute later. FixMyStreet ref: 4999902.

Its impossible to access the bridleway that is shown (by signs) to start at this point on the lefthand side of the roundabout from the footpath/cycleway on the actual roundabout. The bridleway appears to be completely overgrown and there are armco barriers blocking it from the cycle / footpath crossing over the A14. Seems to have been designed into the junction remodel with no thought for anyone actually trying to use it to cross the A14 by foot / cycle.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for contacting National Highways.

    We are unable to process or respond to this type of enquiry or request on this platform. Please use this link to send your enquiry info@nationalhighways.co.uk , from a safe place.

    Your enquiry will then be passed to the appropriate team for a response to your report.

    Kind regards National Highways

    State changed to: No further action

    Posted by National Highways at 09:04, Mon 18 September 2023

This report is now closed to updates from the public. You can make a new report in the same location.