You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Uneven and unacceptable high ridge on motorway

Reported via mobile in the Road surface (NH) category anonymously at 11:17, Tue 5 September 2023

Sent to National Highways less than a minute later. FixMyStreet ref: 4960404.

At about 200 metres on the westbound carriageway, there is deep ridge between the old and new road surfaces. It's undoubtedly causing serious damage to potentially hundreds of vehicles.

This was reported to the Highways Agency on 01 Sep 23 and all you did was acknowledge and promptly closed the report stating "we are looking into it". This is totally unacceptable and the log should remain open until the road surface is fixed - which should be as a matter of urgency

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for your report.

    We're aware of this issue and temporary warning signs 'Ramp Ahead' have been ordered to be installed within the next few days.

    Longer term the issue will be resolved one the New Monks Farm developers have appointed a new contractor following Buckingham Group entering administration.

    Kind regards

    National Highways

    State changed to: Closed

    Posted by National Highways at 08:17, Thu 7 September 2023

This report is now closed to updates from the public. You can make a new report in the same location.