You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

It would appear you’ve forgotten to open the motorway….

Reported via mobile in the Abandoned Materials (NH) category anonymously at 20:26, Mon 10 July 2023

Sent to National Highways less than a minute later. FixMyStreet ref: 4771517.

50mph for lane closure NOT required. There is no permanent works or signs highlighting what’s going on? Therefore I can only assume you’ve forgotten to re open the closed lane or put the live three lanes to a suitable speed as there is no risk to an empty lane of cones??

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for contacting National Highways regarding the M3 junction 4 lane closures.

    We apologise for any ongoing delays as a result of undertaking structural surveys. This type of survey takes a while to organise and analyse but its important that we do this to prevent further disruption in the future.

    Whilst the lane 1 closure is in place a 50mph speed limit will be applied to the three open lanes to reflect a reduction in the lane capacity, in accordance with the traffic management standards.

    Kind regards,

    National Highways

    State changed to: Closed

    Posted by National Highways at 13:29, Wed 12 July 2023

This report is now closed to updates from the public. You can make a new report in the same location.