You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Graffiti the length of the motorway

Reported via desktop in the Graffiti (NH) category anonymously at 13:11, Tue 27 June 2023

Sent to National Highways less than a minute later. FixMyStreet ref: 4722138.

I'm afraid that, as predicted, the failure to address the graffiti issue at the bridges along the motorway effectively and repeatedly, has now grown on to defacing all of the road signage. Destinations have been obliterated and what it all says to those coming to the area and the city in particular is depressing. Is it beyond the wit of you and the necessary partners to put together a coordinated strategy to sort it out?

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for contacting National Highways about graffiti.

    We aim to remove or cover offensive graffiti within 24 hours of our inspection. Non-offensive graffiti is dealt with under planned cyclical works and can take much longer.

    We will arrange for our local inspector to look at this on his regular safety inspection of this route and they will arrange a suitable solution.

    Kind regards

    National Highways

    State changed to: Internal referral

    Posted by National Highways at 14:09, Fri 30 June 2023

This report is now closed to updates from the public. You can make a new report in the same location.