You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Overgrown Pathway

Reported via desktop in the Pavement/footpath/cycleway/bridleway issue (NH) category by Karen England at 10:51, Fri 23 June 2023

Sent to National Highways less than a minute later. FixMyStreet ref: 4707733.

I have reported this problem multiple times and nothing ever gets done. This pathway is extremely overgrown now that in places you can't even see the A3 over the vegetation. Some of the bushes or very prickly and overhang onto the path. It literally is like taking a jungle hike with protective clothing needed. I have even resorted to contacting my local Councillor as I am at a loss of what to do now. She reported that she had a phonecall last week to say it was being cleared. This was a lie as nothing has been done. As this is the only access non drivers we have no other choice but to use this path daily to get to work and into the villages of Thursely and Milford. It is totally unacceptable for a pathway to be like this and never maintained.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for your report concerning overgrown vegetation.

    We’re aware of the overgrown vegetation. A repair is planned, and the work(s) should be completed no later than 4 July 2023.

    Kind regards

    National Highways

    State changed to: Closed

    Posted by National Highways at 13:49, Mon 26 June 2023

This report is now closed to updates from the public. You can make a new report in the same location.