You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Massive backlog of traffic on M3

Reported via mobile in the Roadworks (NH) category anonymously at 16:12, Sat 10 June 2023

Sent to National Highways less than a minute later. FixMyStreet ref: 4655296.

The notification of the closing of the M3 (at the Hook exit), was non existent until almost upon the point of closure! The illuminated sign seemed to indicate only lane reduction (to one lane), there was only one sign and it was past the point of no return, no exit until the actual roadworks. The result was thousands of cars and lorries in a queue for at least 1 1/2 hours, moving at a crawl at best! There was no traffic management present, just a closed road and traffic chaos!

Updates

  • This is still appalling. No lane filters or signs until 800m before J5 closure. So 3 lanes traffic trying to get into 1 lane to exit m3. Whi isn’t it cones from 3 to 2 then to 1 lane from Basingstoke? Why no signs from J7 & J6 warning closed and long delays at J5? Won’t make Father’s Day lunch ! Been between J6 &J5 for over 1 hr - disgraceful highway management ..

    Posted anonymously at 12:36, Sun 18 June 2023

Provide an update

Please note that updates are not sent to National Highways. Your information will only be used in line with our privacy policy

Next: Tell us about you

Your update

Tell us about you

Do you have a National Highways Report a problem password?