You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Dangerous pothole

Reported via iOS in the Pothole (NH) category anonymously at 08:47, Sat 29 April 2023

Sent to National Highways less than a minute later. FixMyStreet ref: 4498589.

Clockwise carriageway lane 3

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Hi Highways Your team do a wonderful job.

    Last night there were works on the M25 from around J14 /16 clockwise with M25 Shut with diversion through Denham and Rickmansworth. I was travelling 23.40 to 00.10 and called to ULEZ charge to enquire. They have advised as the diversion was not set up Transport for London ULEZ charge would need payable for both days 3/2/24 and 4/2/24. I was wondering if this can be looked into because I am quite sure that Transport would happily send out PCN to drivers that inadvertently assume the diversion has been agreed with Transport for London. Its a bit cheeky would I be able to get refunded.

    Regards

    Posted anonymously at 14:04, Tuesday 4 February 2025

Provide an update

Please note that updates are not sent to National Highways. Your information will only be used in line with our privacy policy

Next: Tell us about you

Your update

Tell us about you

Do you have a National Highways Report a problem password?