You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Junction onto roundabout - the road surface is extremely damaged and is very dangerous as it affects breaking before entering roundabout. It is unavoidable and affects ABS on cars

Reported via desktop in the Road surface (NH) category anonymously at 18:26, Sat 15 April 2023

Sent to National Highways less than a minute later. FixMyStreet ref: 4443842.

This road has been in an extremely poor condition for far too long. It has been reported before by other people and your reply was that it would be repaired by 15th March. It is now the 15th April.

Updates

  • Thank you for your report concerning the carriageway condition.

    We’re aware of this and are currently designing a scheme 'A27 Southerham to Beddingham' for construction later this financial year.

    In the meantime any safety defects will re reported during our safety inspections for repair.

    Kind regards

    National Highways

    State changed to: Closed

    Posted by National Highways at 09:14, Mon 17 April 2023

This report is now closed to updates from the public. You can make a new report in the same location.