You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

M11 northbound c/w between Blunts Farm depot and M25 over bridge, there are major longitudinal surface defects (potholes)

Reported via desktop in the Pothole (NH) category anonymously at 09:36, Mon 10 April 2023

Sent to National Highways less than a minute later. FixMyStreet ref: 4418910.

The surface defects appear to have been reported before by other road users over the last few months without any corrective action. The defects are significant, and are likely to increase risk of vehicle damage or safety of road users that swerve erratically to avoid the potholes.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Still open, via questionnaire, 11:05, Mon 8 May 2023

Provide an update

Please note that updates are not sent to National Highways. Your information will only be used in line with our privacy policy

Next: Tell us about you

Your update

Tell us about you

Do you have a National Highways Report a problem password?