B585 River Wyre

Reported via mobile in the Roadworks (NH) category anonymously at 09:07, Fri 17 March 2023

Sent to National Highways less than a minute later. FixMyStreet ref: 4323747.

The fat worker with a beard who is setting the traffic light sequence ( on the New Roadworks fiasco) is incompetence and thinks it humerous for drivers to be in standing traffic.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • At 4:30pm today there was a hold up on Breck Rd towards river wyre roundabout. The single lane of traffic is too narrow as anyone turning left cannot get thru until the ones going straight have gone. The filter was on for ages and only 2 cars went through. Then when straight filter was on, not letting enough cars thru at this time. Once I had turned right towards Shard, cars in opposite direction at a standstill way past the Shard. Whoever designed the light sync should test it for themselves in a car. This would prove that the original roundabout idea worked much better. Please comment by return. Thanks

    Posted by Janet Carpenter at 18:08, Sat 18 March 2023

  • State changed to: Closed

    Updated by National Highways at 17:10, Mon 27 March 2023

This report is now closed to updates from the public. You can make a new report in the same location.