You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Sequencing change has caused huge issues

Reported via desktop in the Traffic lights (NH) category anonymously at 15:59, Fri 3 February 2023

Sent to National Highways less than a minute later. FixMyStreet ref: 4200921.

Whatever sequencing change has occureced within the last couple of weeks needs to be fixed, the queues from fleetwood road back up all the way to carleton crossroads at school run times due to the poor sequencing leaving the roundabout lanes full and no time for carleton traffic (who have no lights to control them) to merge. this is worse than it was before the works were done. it was just about OK, this latest sequence has totally ruined it though.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for your report concerning the traffic signals on the A585 Norcross Junction. Our engineers have recently investigated this issue and could find no fault with the way the signals are operating. However, we accept there is an issue with the performance of this junction and we're conducting further investigations into the cause.

    Kind regards

    National Highways

    State changed to: Closed

    Posted by National Highways at 15:24, Mon 6 February 2023

This report is now closed to updates from the public. You can make a new report in the same location.