Fixed
Series of potholes has been opening up
Reported via desktop in the Pothole (NH) category anonymously at 18:04, Wed 4 January 2023
Sent to National Highways less than a minute later. FixMyStreet ref: 4087391.
About a third of a mile before the Grimston Bar roundabout on the southbound carriageway of the A64, a series of potholes has been opening up after the recent icy weather, and there are now places where the road surface is opening to widening cracks. This need to be repaired as it will already damage vehicles driving directly over the largest potholes.
Updates
-
There was a patch added to the worst but there are still holes, and with the high traffic levels they will open further over time. So a proper repair is still needed.
Posted anonymously at 22:05, Wed 1 March 2023
Still open, via questionnaire -
Large area of delamination of road surface arising to various potholes. Traffic is now actively avoiding three separate areas of delamination and swerving into other traffic.
Posted anonymously at 10:08, Wed 15 March 2023
-
The various sections of the A64 where the potholes were bad, approaching Grimston Bar from the east, have now been resurfaced and the road is in good condition.
State changed to: Fixed
Posted anonymously at 10:30, Wed 12 July 2023
This report is now closed to updates from the public. You can make a new report in the same location.