As you merge onto A12 northbound slip rd at jkt 19

Reported via mobile in the Pothole (NH) category anonymously at 19:18, Sat 31 December 2022

Sent to National Highways less than a minute later. FixMyStreet ref: 4072879.

The is a pothole about 6ft long, over 1ft wide in places and at least 6inches deep. As you merge from the A138 onto the slip for the northbound A12 jkt 19. This is under the new bridge where they have been doing lots of road works and is right on the join/white lines.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for your report concerning the pothole on the A12 at Junction 19. Our inspector visited the location and agrees that work is needed to ensure the safety of road users. A repair is planned for Thursday this week weather permitting.

    Kind regards National Highways

    Posted by National Highways at 13:22, Tue 3 January 2023

Provide an update

Please note that updates are not sent to National Highways. Your information will only be used in line with our privacy policy

Next: Tell us about you

Your update

Tell us about you

Do you have a National Highways Report a problem password?