You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Water coming down the bridleway is causing a mud bank across the pedestrian route from the bus stop to the road crossing

Reported via mobile in the Pavement/footpath/cycleway/bridleway issue (NH) category anonymously at 11:06, Sun 27 November 2022

Sent to National Highways less than a minute later. FixMyStreet ref: 3996738.

The problem gets worse each time it rains. The flooding team are going to clear the drains on the bridleway but the problem for pedestrians needs to be dealt with soon as it is very slippery

Provide an update

Please note that updates are not sent to National Highways. Your information will only be used in line with our privacy policy

Next: Tell us about you

Your update

Tell us about you

Do you have a National Highways Report a problem password?