You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Damaged cycle path

Reported via mobile in the Pavement/footpath/cycleway/bridleway issue (NH) category anonymously at 13:40, Wed 3 August 2022

Sent to National Highways less than a minute later. FixMyStreet ref: 3727822.

The cycle path is badly subsided, and vegetation growing through path. The cones placed here have fallen over and the tape has created more of a hazard flapping around. This section is now very narrow dangerous.

Updates

  • Thank you for contacting National Highways through our ‘report a problem on our network’ website. This facility is specifically for reporting defects such as a broken sign or barrier, litter, overgrown vegetation or potholes. Unfortunately, we’re unable to reply through the website for the type of report you’ve made on this occasion, and kindly ask you to contact our Customer Contact Centre on 0300 123 5000 or at info@highwaysengland.co.uk if you’d like us to respond.

    Posted by National Highways at 09:02, Thu 4 August 2022

Provide an update

Please note that updates are not sent to National Highways. Your information will only be used in line with our privacy policy

Next: Tell us about you

Your update

Tell us about you

Do you have a National Highways Report a problem password?