You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Back to all reports

Loads of temporary equipment behind

Reported via mobile in the Roadworks (NH) category anonymously at 20:42, Tuesday 2 August 2022

Sent to National Highways less than a minute later

I can see this has been reported by there are half a dozen temporary sign frames at both entrances to the village of Water Newton on the A1 Southbound. Your workers have definitely down tools and left, there isn't any works going on and the signs all need collecting. It's a massive eyesore upon entering the village and I can't see how it isn't very similar to flytipping, which is a criminal offence.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for your report concerning redundant roadworks equipment on the A1.

    We are currently looking into a way that we can overcome this issue and will endeavour to remove all redundant signage and equipment at our earliest opportunity.

    Due to the volume of roadworks across our network it can be difficult to identify which equipment needs to stay or be removed.

    We have passed your report on to the relevant department who will investigate your concerns. In the future could you please report issues such as this to our Customer Contact Centre as this reporting tool is designed for defects such as a broken sign or barrier, litter, overgrown vegetation or potholes.

    Our Customer Contact Centre, available 24 hours a day at:

    • 0300 123 5000 • info@highwaysengland.co.uk

    Kind regards

    National Highways

    State changed to: Closed

    Posted anonymously at 11:59, Friday 5 August 2022
    Moderated by National Highways at 11:59, Friday 5 August 2022

This report is now closed to updates. You can make a new report in the same location.