You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Debris/Rubbish

Reported via desktop in the Litter (NH) category anonymously at 12:15, Mon 7 March 2022

Sent to National Highways less than a minute later. FixMyStreet ref: 3368484.

When the temporary 50mph roadsigns were removed from the concrete central barrier the piles of dirt/ rubbish/deterious under the signs was left behind and are now growing weeds. Surely a person with a shovel could have removed the pile when the sign was being removed? This is the whole length of the motorway where the temporary speed restrictions were in place.

Provide an update

Please note that updates are not sent to National Highways. Your information will only be used in line with our privacy policy

Next: Tell us about you

Your update

Tell us about you

Do you have a National Highways Report a problem password?