You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Light phasing

Reported via desktop in the Traffic lights (NH) category anonymously at 13:03, Sun 27 February 2022

Sent to National Highways less than a minute later. FixMyStreet ref: 3347642.

The waiting area at the island for vehicles heading onto the A5127 north or A5148 north is far too short as only allows for one HGV or two cars. More than that and vehicles are stranded blocking the access onto the A5 westbound. The phasing of the lights need changing or better still a total redesign of this island to improve matters (unlike the previous redesign which just made it worse). There needs to be a minimum of three lanes heading north between the two sections of the dumbbell - or better still make this a grade separated junction as it was intended to be even before the M6 toll.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for contacting National Highways through our ‘report a problem on our network’ website. This facility is specifically for reporting defects such as a broken sign or barrier, litter, overgrown vegetation or potholes. Unfortunately, we’re unable to reply through the website for the type of report you’ve made on this occasion, and kindly ask you to contact our Customer Contact Centre on 0300 123 5000 or at info@highwaysengland.co.uk if you’d like us to respond.

    Kind regards National Highways

    Posted by National Highways at 08:53, Thu 3 March 2022

Provide an update

Please note that updates are not sent to National Highways. Your information will only be used in line with our privacy policy

Next: Tell us about you

Your update

Tell us about you

Do you have a National Highways Report a problem password?