You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Missing rubber wedges at expansion joint on cyclepath

Reported via desktop in the Pavement/footpath/cycleway/bridleway issue (NH) category anonymously at 09:20, Sun 25 April 2021

Sent to National Highways less than a minute later. FixMyStreet ref: 2689730.

Two rubber wedges are missing from the south west side of the ramp at the expansion joint, creating a 40 mm high step in the cycle path.

This joint is in any case unsatisfactory and is long overdue for fairing in as on the M4 Severn Bridge cycle path expansion joints.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Large white bag of corn or somethingon avonmouth bridge edging into slow lane southbound

    Posted anonymously at 13:37, Sun 3 October 2021

Provide an update

Please note that updates are not sent to National Highways. Your information will only be used in line with our privacy policy

Next: Tell us about you

Your update

Tell us about you

Do you have a National Highways Report a problem password?