You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Surface on Bromford Viaduct

Reported via desktop in the Road surface (NH) category anonymously at 19:14, Tue 6 April 2021

Sent to National Highways less than a minute later. FixMyStreet ref: 2656490.

The surface on the Bromford viaduct is dreadful. Every single joint is bumpy.

Updates

  • Thank you for your patience whilst our inspector reviewed your report. I'm sorry for the delay in responding to you.

    During the review our inspector doesn’t feel that this is causing any safety concerns at this time and remedial work isn’t required.

    We will continue to review this and will arrange any required work if the situation changes.

    If you require any further update on this issue our Customer Contact Centre is available 24 hours a day at: • 0300 123 5000

    • info@highwaysengland.co.uk

    Kind regards Highways England

    Posted by Highways England at 12:23, Thu 8 July 2021

Provide an update

Please note that updates are not sent to National Highways. Your information will only be used in line with our privacy policy

Next: Tell us about you

Your update

Tell us about you

Do you have a National Highways Report a problem password?