You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Pothole

Reported via mobile in the Pothole (NH) category anonymously at 07:57, Sun 21 March 2021

Sent to National Highways less than a minute later. FixMyStreet ref: 2622783.

Large pothole appearing in existing cool tarmac repairs

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for your report, which has been passed to our inspector for review during the next safety inspection along this stretch of the A27, when any defects will be recorded and appropriate mitigation arranged.

    Safety defects are attended to and made safe within 24 hours and any permanent repairs that are required are then carried out within 28 days. Service defects are less severe and are further categorised into high or low priority. Service high defects will aim to be repaired within 6 months, whereas service low defects are monitored and placed into future programme of works and bid for funding.

    Kind regards Highways England

    State changed to: Fixed

    Posted by Highways England at 11:08, Mon 22 March 2021

This report is now closed to updates from the public. You can make a new report in the same location.