You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Surface of M62 Junction 6 ring road is in extremely poor condition

Reported via desktop in the Road surface (NH) category anonymously at 12:20, Sat 20 March 2021

Sent to National Highways less than a minute later. FixMyStreet ref: 2621550.

The surface of M62 Junction 6 ring road leading on to the M57 is in extremely poor condition. There are multiple pot holes along the stretch of road that you have to swerve away from to avoid, which is dangerous on the ring road. Also the surface is very bumpy, that makes the drive feel like you're driving off road even when reducing speed to 35mph. I have been using this stretch of road for 8 months now everyday for my commute and it is getting worse with all the heavy goods vehicles passing through it on a daily basis, which has an impact everyday.

Updates

  • Thank you for your report of the road surface condition on the M62 J6 link to the M57 Northbound. We'll inspect this location and arrange any necessary works to ensure this route is safe for traffic. If you require any further update on this issue our Customer Contact Centre is available 24 hours a day at: • 0300 123 5000

    • info@highwaysengland.co.uk

    Please quote to discuss this matter further.

    Kind regards Highways England

    State changed to: Internal referral

    Posted by Highways England at 08:38, Tue 23 March 2021

This report is now closed to updates from the public. You can make a new report in the same location.